Our projects

Turning land into
energy infrastructure.

We develop energy projects step by step, on a sound technical basis and with a long-term operational perspective. Our first venture is the planned solar park in Strellc i Ulët.

PROJEKT 01IN DEVELOPMENT

Strellc i Ulët Solar Park

The first stage of our energy vision.

A photovoltaic facility with a target capacity of approximately 0.8–1 MWp is being assessed on an initial area of around one hectare. The electricity generated is intended to be fed into the public grid via a transformer station and the medium-voltage connection specified by KEDS.

The project is planned as long-term energy infrastructure with a perspective of at least 35 years. NURAJ ENERGY intends to develop, own and operate the facility and sell the energy it produces.

Location
Strellc i Ulët, Deçan
First stage
approx. 1 hectare
Target capacity
approx. 0.8–1 MWp
Target start
from 2028 or earlier
Perspective
expansion to approx. 4–5 ha
Operating period
at least 35 years

Project visualisation

What the solar park could look like.

The images provide an initial impression of the possible arrangement of the solar modules, internal roads, inverter station, transformer station and feed-in station.

01 · Possible overall view
01 · Possible overall viewSolar park and technical stations
02 · Technical overview
02 · Technical overviewFrom the solar module to grid feed-in

Non-binding concept visualisations. Site layout, technical implementation and dimensions may change during detailed planning, permitting and grid assessment.

Technical system

From sunlight to the electricity grid.

01

PV module field

Solar energy is converted into direct current across technically optimised module areas.

02

Inverters

The direct current generated is efficiently converted into grid-compatible alternating current.

03

Transformer station

Protection, metering and transformation equipment prepare the energy for medium voltage.

04

Grid feed-in

The energy enters the public grid via the approved KEDS connection point.

Development status

Assess and secure,
then deliver.

  1. 2026–2027Land and zoning assessment

    Clarify plots, ownership, zoning classification and legal requirements.

  2. 2026–2027Grid assessment

    Assess capacity, feed-in point, medium voltage and technical conditions with KEDS.

  3. 2027–2028Planning & permits

    Secure feasibility, yield, construction concept, financing and required approvals.

  4. From 2028Construction & commissioning

    Deliver and inspect the first stage, connect it to the grid and begin operation.

Project information

Capacity, area and schedule figures are current project objectives and not binding guarantees. Final implementation depends in particular on zoning approval, permits, technical feasibility, financing and a binding grid-connection commitment.